久草在线观看首页1|亚洲第一免费毛片|国产乱视频在线观看|麻豆一区在线观看|国产波霸爆乳一区二区|无码日韩精品一区二区人妻|欧美精品在线观看|凹凸国产熟女精品视频

在線客服
熱線電話(huà)

微信公眾賬號(hào)
Hello! Welcome to Shenzhen Tergy Technology Co., Ltd.
全國(guó)服務(wù)熱線
They are in search:Fuse | ESD protector | TVS diode | varistor | gravitron | MLCV | self recovery fuse
Support
Search
   Product Category Search
Latest applications
Contact Us
 
Company Name: Shenzhen Tage Technology Co., Ltd.
Phone: 86-755-88365418,88365225,88363209
Fax: 86-755-88361758 Holiday Service Phone: 18128869501 E-mail: evan@m.idea988.com
Address: Shenzhen Baoan District city streets of entrepreneurship garden Amoy king business building

FAQ

You are here:Home >> Support >> FAQ
Surge protector wiring diagram
Publish:Shenzhen Tergy Technology Co., Ltd.  Time:2016-10-17
Surge protector wiring diagram - surge protector access mode
In the TN standard, general SPD only for common mode connection, which is connected to the neutral line and ground line between.
But in the initial position of the TN-S system, access the surge protection device is not needed between the neutral wire and ground protection. Only the power port for particularly important equipment third class a lightning protection level in third, grade four and grade B in the lightning protection level, only need to do differential access, which increase the surge protector is connected between the phase line and the neutral line.
In the TT standard, when the first surge protector in leakage protection device, can be used as the common mode connection. When the leakage protector is located on the first level and the high voltage surge protection device, system as the center point of the grounding system, surge protector should be "3 + 1" connection, namely the three phase of the neutral line are respectively connected with a surge protector, neutral line on the ground is connected with a surge protector.
In the IT standard, surge protector only for common mode connection.
The installation of SPD in the IT system without neutral line
(The installation of SPD in the IT system without neutral line)
Explain:
1, the power of the device.
2, power distribution panel.
3, total ground terminal or rod.
4, surge protector.
5, SPD grounding, 5A or 5B.
6, protected equipment.
7, residual current protection device (RCD).
SPD - F manufacturing plant requirements for the installation of protective devices (e.g., fuses, circuit breakers, RCD);
RA - the ground electrode of the device;
RZ - earth electrode of power supply system;
(open or /----).
Industrial installation circuit
(Industrial installation circuit)
Explain:
B2, B1 - Building 1, 2.
MB - main building.
EB - equal potential wiring board.
MPB - the main switchboard.
Eq - load equipment.
PB - distribution panel.
TT系統(tǒng)
(TT system)
Previous:  2020/07/27
Next:What are the transient diode effects?  2016/10/13
Products